Nepean River Bridge, Penrith NSW

Fixed lump sum contract: Value $375,000

Project Description:

  • Ozfix were awarded the contract by Seymour Whyte Constructions (on behalf of Roads & Maritime Services) to install Kiln Dried Hardwood to the new structure. The bridge is the longest single span shared path bridge in Australia.
  • There were 9000 metres of hardwood battens fixed to the balustrades, viewing decks & terraces and overhead canopies.
  • Works were completed over an 18 week period from February – October 2018.
  • The bridge was officially opened the NSW Premier on Sunday the 28 October 2018

Link:  Seymour Whyte on this project.